A repair that waits on a part is downtime with a known cause. Spares Reorder reads the parts issued against work orders in your maintenance system, the in-stock, reserved, and minimum quantities in each stockroom, and the open work orders whose parts are not yet on hand.
It projects when each part's stock falls short of planned work and proposes a reorder before that date. Where consumption has moved away from the minimum on file, it proposes a new minimum. A storeroom lead or planner approves each proposal. The purchase requisition is drafted in your maintenance system or ERP for a buyer to send, and every decision leaves a receipt.
This is a reference listing. It documents what Fibric would read from Spares Reorder and what it could propose, based on the vendor's published interfaces. Fibric builds it under a managed deployment when you request it; selecting it here installs nothing.
Inputs
Parts issued on work orders and each work order's part stage, such as no parts, reserved, kitted, or issued, from MaintainX
Stockroom part records with in-stock, reserved, ordered, minimum, and maximum quantities per location
Open and planned work orders, including preventive maintenance schedules, and the parts they call for, from UpKeep or Fiix
Purchase orders and their status in your maintenance system or ERP
Part transfer requests between stockrooms
Vendor and lead-time detail held on the part or vendor record
Proposed actions
Target capability: propose a reorder for a part whose stock will not cover planned work orders before the next receipt
Target capability: propose a new minimum quantity for a part whose consumption has moved away from the minimum on file
Target capability: propose a purchase requisition or purchase order draft in your maintenance system or ERP for a buyer to send
Target capability: propose a transfer from another stockroom that holds the part, when that arrives sooner than a vendor
Target capability: propose a hold note on a work order whose part will not arrive in time, so the planner can reschedule
Proposed actions are target capabilities. Every action runs propose-first and needs a validated deployment and the appropriate permissions.
What you can build
Reorder before a preventive maintenance job waits
Planned PMs in MaintainX call for parts. When in-stock less reserved falls short of the PMs in the planned window, a reorder is proposed with the vendor on the part record.
A part issued on Fiix work orders far above its minimum on file gets a proposed new minimum, with the consumption history shown, for the storeroom lead to approve.
Approved reorders become purchase order drafts in Business Central with vendor, quantity, and requested receipt date, linked back to the work orders that need the part.
A maintenance system that records parts used on work orders (MaintainX, UpKeep, Fiix, Limble CMMS, or IBM Maximo Manage)
Stockroom quantities and minimums per part, in the maintenance system or your ERP
Purchase order records for parts, in the maintenance system or an ERP such as NetSuite or Business Central
A storeroom lead or planner named to approve reorders and minimum changes
For UpKeep, an Enterprise plan; its API is limited to that tier
Authentication
An API key from your maintenance system, generated by an administrator (MaintainX issues a bearer token under Settings, Integrations, API Keys; UpKeep uses session tokens), plus ERP credentials where purchase orders live there.
Limits
Parts used but never logged on a work order are not counted. Consumption is only what the maintenance system recorded.
A part with no vendor or lead time on record gets a stock warning, not a reorder date.
Minimums are proposed per stockroom. It does not pool stock across sites unless a transfer is proposed and approved.
No vendor ever receives an order from it. The requisition stays a draft until a buyer sends it.
Access and pricing
Reference listing. Fibric builds the operator under a managed deployment when you request it. Your quote covers the build, capabilities, usage, and support.
A storeroom lead or planner. A reorder shows part, vendor, quantity, and needed-by date. A minimum change shows the old and new value and the consumption behind it. The approver can edit the quantity, pick another vendor, or decline.
What is written down after a decision?
A receipt per proposal: the part, the stock and work-order figures it read, the action approved, who approved it, when, and the requisition or minimum change that followed. Each receipt states how to reverse the change.
Does it ever order parts on its own?
No. It reads work orders, stock, and purchase orders and proposes. A purchase order draft is created only after approval, and a buyer still sends it to the vendor.
Ask about Spares Reorder
Ask about the capabilities and requirements in this listing.
This operator is developed, published, and supported by Fibric. Third-party names and logos identify the systems an integration connects to; they are the property of their respective owners, who are not affiliated with Fibric and do not sponsor or endorse this listing. Trademark policy