Operator by Fibric · Reference · built on request
ETA Notice
Computes a delivery ETA from vehicle position and remaining stops and proposes a customer text or email when it leaves the promised window.
Reference · built on requestCommons signalTransit, roads & mobility
Minute-level Dutch road traffic, travel times, incidents, roadworks, bridge openings, and truck parking from NDW's open data portal.
Nationaal Dataportaal Wegverkeer (NDW) is a joint body of Rijkswaterstaat, the twelve provinces, the four largest municipalities, Vervoerregio Amsterdam, and Metropoolregio Rotterdam Den Haag. Its open data portal at opendata.ndw.nu serves gzipped DATEX II files: speeds and intensities per lane and vehicle category, travel times over predefined sections, the Actueel beeld situation feed, planning feeds for roadworks, events, and bridge openings, temporary closures and speed limits, truck parking status, and charging point locations.
Through Fibric, an operator reads the sections and situation records on your routes and proposes an ETA change, a rest stop, or a detour for your approval. Every proposal cites the DATEX II record and its timestamp.
This is a reference listing. It documents what Fibric would read from NDW Open Data and what it could propose, based on the publisher's published interfaces. Fibric builds it under a managed deployment when you request it; selecting it here installs nothing.
Read-only. This feed informs operators; it changes nothing.
Proposed actions are target capabilities. Every action runs propose-first and needs a validated deployment and the appropriate permissions.
The travel time for the sections on a driver's route, in seconds, sets the delay. The operator proposes an ETA notice with the section names and the minute it read.
With ETA Notice
A closure in tijdelijke_verkeersmaatregelen_afsluitingen or a planned opening in planningsfeed_brugopeningen ahead of a truck lets the operator propose a detour before the driver reaches it.
With Route Deviation
Truckparking_Parking_Status shows occupancy each minute. When a driver nears a rest limit, the operator proposes the nearest parking with space and records the status it read.
With Driver Hours
charging_point_locations.geojson and the OCPI tariff file give an electric van its options on route. The operator proposes a stop and tariff for your approval.
With Charge Readiness
Reference listing. Public feed access is separate from Fibric integration. If you request this feed, your quote covers the build, usage, and support.
Request NDW Open Data ↗Ask about the capabilities and requirements in this listing.
For project-specific requirements, contact Fibric.
This Commons signal listing is developed, published, and supported by Fibric. It reads public data published by Nationaal Dataportaal Wegverkeer (opendata.ndw.nu). Upstream agencies and projects are the property of their respective owners, who are not affiliated with Fibric and do not sponsor or endorse this listing. Trademark policy