Entrata
Properties, units, leases, residents, ledgers, and work orders from Entrata, with work order and lease proposals.
Reference · built on requestOperator by FibricProperty & tenants
Sequences make-ready work between a move-out and the next lease from punch lists, vendor load, and parts on hand, and proposes a ready date.
Unit Turn is an operator job for the days a unit sits empty. It reads move-out and move-in dates from Entrata or Buildium, the punch list from an Entrata inspection or a Facilio work order's tasks, the make-ready work orders and their status in Facilio, Limble, MaintainX, or UpKeep, each vendor's open load, and the parts on hand in the storeroom or parts module of that system. It reads the trade order and durations you set.
For each turn it proposes a plan: one work order per trade in sequence, dated from the move-out, and the ready date the plan implies. When a task slips it proposes a new date. When a part for the turn is short it proposes a purchase request. The leasing manager approves each, and the record shows why the date moved.
This is a reference listing. It documents what Fibric would read from Unit Turn and what it could propose, based on the vendor's published interfaces. Fibric builds it under a managed deployment when you request it; selecting it here installs nothing.
Proposed actions are target capabilities. Every action runs propose-first and needs a validated deployment and the appropriate permissions.
A lease with a move-out date inside the horizon is read from Entrata. The operator proposes Facilio work orders per trade in your order, dated from move-out, and the ready date they imply.
Limble parts on hand are checked against what the paint task needs. Short stock becomes a proposed Limble purchase order, dated to land before the task, and the Buildium move-out date sets the deadline.
With Limble CMMS, Buildium
A MaintainX WORK_ORDER_OVERDUE event on the flooring task pushes the tasks behind it. The operator proposes a new ready date and a Buildium note on the property explaining the change.
Each trade becomes an UpKeep work order with a worker or team. The operator watches STATUS_UPDATED events, proposes the next trade's start as each closes, and reports the ready date against the Entrata move-in.
Reference listing. Fibric builds the operator under a managed deployment when you request it. Your quote covers the build, capabilities, usage, and support.
Request Unit Turn ↗Ask about the capabilities and requirements in this listing.
For project-specific requirements, contact Fibric.
This operator is developed, published, and supported by Fibric. Third-party names and logos identify the systems an integration connects to; they are the property of their respective owners, who are not affiliated with Fibric and do not sponsor or endorse this listing. Trademark policy